Project Description:
The project is an extension from both ends of the Indian Trail Complete Street Phase 1 project limits, which is currently in right-of-way acquisition. Phase 2 will consist of more transportation improvements that will be located along two portions of the existing roadway. The first section of construction will be between Gribble Road and Old Monroe Road, with the other section between Liberty Lane and Independence Blvd. These transportation improvements will include the installation of storm drainage, curb, and gutter, 10-foot multi-use concrete paths on both sides, and a two-way left turn lane down the middle of the street.
Project Status:
Design
Council Priority Focus:
Roads and infrastructure
Expected Completion:
TBD
Funding:
- Amounted Funded: $720,000 (for design)
- Fully Funded: No
- Un-funded Amount: TBD
Renderings of the Proposed Indian Trail Road Complete Street Phase 2 Improvements: